In Charge of Construction and Installing Three Pipes

I was in charge of installing the Tank Farm,Pumping stations,installing 1960 Lin ft of three fuel pipes,1-6"/1-8"/1/4",into the South Pacific,from the Island of Tinnian.Marianas Island
This original submitted content does not necessarily represent the editorial style, standards or view of American Profile.

I was in charge of installing the Tank Farm,Pumping stations,installing 1960 Lin ft of three fuel pipes,1-6"/1-8"/1/4",into the South Pacific,from the Island of Tinnian.Marianas Island, the Largest air plane base in the world,and still is.

You folks must contact Me now,if you are really interested in learning the Historical truth of such endeavors.

Upload Your Own Stories, Photos and Videos

share icon
Every week, American Profile magazine brings you stories that celebrate the people and places that make America great. Now we want to hear your stories and see your photos, videos and even audio.

share your story Start Uploading Now!

Related Stories

If you enjoyed reading this story, In Charge of Construction and Installing Three Pipes, then you might enjoy these other stories.
 

Discuss this Article

There are no current discussions for this article. Why not be the first?

post your comment Post your comments on this article

The Blind Side Sweepstakes
Newsletter Sign Up
share ad

current issue
Below are the most recent articles from our Relish sister site. Click on the "Spry" tab above to see the most recent articles from our other sister site.
Read More
current issue
Below are the most recent articles from our Spry sister site. Click on the "Relish" tab above to see the most recent articles from our other sister site.
Read More